Friday, 11 July 2025

RISK SURVEY REPORT - MACHINERY BREAKDOWN


 

RISK SURVEY REPORT - MACHINERY BREAKDOWN

 

Name of client                          :

 

Survey location                         :

Risk                                         :  -

Date of survey                          : 2 March 2004

Surveyed by                              : Sudarno

Persons accompanied                :

                                                 

Coverage                                  : MB

Document received                   :  - chillier         :  check list of preventive maintenance

                                                  -  pump            :  none

                                                  -  Electrical      : Log book

                                                  -  Telecommunication : none

-      Generator set  : Log book

-      Transformer : log book, treatment minyak trafo

-      Escalator : schedule maintenance

          

Management history                  : Not advised

 

The insured is utilities of Mall building such as generator, chillier, transformer, cubicle, capacitor bank, Master processor unit of lift, hydrant pump, elevator, escalator, pump, fire detector and PABX etc.

 

Utilities were maintained by own engineer, and sub contractor. The all electrical equipment of building were operated by own operator (technician).

There are 2 five section :

1.              Mechanical section : hydrant pump, water supply pump, Chillier and air condition

2.              Electrical section : electrical, Power Generator, Telephone line,  fire detector,  Paging

 

The utilities are located in the ground floor / basement floor, excepted MPU lift on the duct floor, fire pump, PABX, Fire detector on the 1st floor

 

The Utilities specifications as follows:

 

1.              Cubical

a.               incoming :  Merlin Gerin

b.              Metering  : Merlin Gerin

c.               Out going : Merlin Gerin

 

 

 

 

 

2.              Panel LVMP 3 units (UNINDO, 427, 228, 428, Standard IEC 2, 98)

3.              Transformer : 2 units of Trafindo transformer 2,000 KVA, (Transformer no 2 no : series : 9330441,year 1993 and transformer no. 1 No. series : 93384440, year 1993

 

Comments :

-            Transformer No. 2 has temperature 75° C at the inside oil transformer temperature (visually from the temperature equipment at the transformer.

-            The transformer room was very hot

-            The Voltage step down from 20 KV to 380 KV via 2 units oil cooled transformer

-            There are 1 unit of transformer no. 3  as stand by

     

4.              Diesel engine : 3 units of  Cartepilar diesel  with  Cartepilar  generator 1825 KVA. 

Comments :

-           We carried out a test during our inspection, and noted that operation were competent. (Diesel No 1 and No. 2 test result : OK it was visually satisfactory))

-           Diesel as back up of power supply

-           Running test 1 time per week duration 5 meni.

 

5.              Elevator / lift / escalator

There are 10 units of Gold star escalator and 2 units Hyundai escalator, and 1 unit of lift

Comments

6.              Water System : Domestic water pump, and Fire Fighting system : Ebara Jockey pump,   Ebara pump with elektrim Electric sprinkler and hydrant pump

7.              Air conditioning system : 3 units of Carrier Chillier of DR 125 TR and 1 unit of Carrier Chillier 200 TR, and there are many split air condition

8.              Telecommunication : Telephone line,  fire detector,  paging 

 

 

PROTECTION

 

Extinguishing system

Portable fire extinguishers were provided in the equipment and utilities area. They were conspicuously mounted on the walls for immediate use to suppress any incipient fire. prior to the activation of sprinkler. Total numbers of portable fire extinguishers are not clear.

 

There is various size of portable fire extinguishers (hand held type and wheeled type) that mostly filled with Dry chemical and CO2. In the risk were installed adequate portable fire extinguishers.

 

Smoke and Heat Detector.

The Insured has installed alarm every floors of utilities area. Smoke detector and heat detector,  every 5 sq. m. with temperature 57° C. There are using conventional fire alarm systems with zone systems. 

 

 

 

 

Hydrant and sprinkler system

The Insured has installed Hydrant and sprinkler system every floors. Sprinkler system was installed every 5 sq. m.

 

All fire pumps are installed in the ground floor taking suction from a hydrant water storage tank in pump station which is automatically replenished by grundfos pumps.

 

Security

There are many people and police who specialised located in the insured area, security guards who watch the premise for the whole days divided into three shifts. the security is to watch people activity in the building.

 

Brigade

The nearest public fire brigade is located in Lebak Bulus, Jakarta Selatan approx. 8 km distance away. Time response for the fire engine to reach the premise is estimated 20 minutes.

 

MAINTENANCE

The insured is care to good machinery such as periodically checked the workers duty in the field due to this electrical is very danger for equipment.  The workers duties are as follows;

 

1.              Daily inspection.

The employee is not inspect the electrical equipment or utilities before to turn on such as :

a.               Diesel / Generator.

Comments :

We did  see daily maintenance report (log book), but we did no see checklist  at the diesel area  and check list about voltage and current at the generator control room) 

 

b.              Transformer :

The last of oil transformer treatment by Cv Ernest Kolega at 4 June 2003,

Comments :

We found the temperature of  transformer no 2 was signed 75° C  and we checked with my infrared approx. 90°C  and the room temperature was very hot condition

                       

2.              Preventive maintenance: Preventive maintenance is weekly, monthly, half year job duty as follows :

a.               Engine system.

Radiator maintain, engine maintain, generator maintain, cleaning room, cleaning panel control.

Comments :

We did maintenance report sheet, log sheet  of generator set.

The housekeeping in the Generator area is considered fair

 

 

 

 

 

 

b.              Electrical Panel (panel LVMDP)

Comments :

We didn’t see maintenance report sheet  schedule and we found some of electrical panel in dirty

.

c.               Escalator / elevator system / Lift

Comments :

The escalator and Elevator were maintain by PT Pilar Utama as sub contractor in charge for maintenance this equipment such as for general cleaning & M/R condition, contactors, control panel equipment, lubricant of brake plunger lever pin, brake slip distance & brake torque, motor drive, etc. (please see elevator maintenance schedule  list)

 

d.              Fire fighting system

We found information from Mr. Surya W as Telecommunication engineer that Sprinkler head, fire bell, fire break glass, ceiling speaker, smoke and head detector etc  were checked regularly but they haven’t equipment checklist.

 

e.         Chillier system

Chilled water in / out, discharge pressure, condenser, suction, etc. were maintain by Pt.  Sampurna air condition.(please see Chillier check list)

 

            f           Pump

The person in charge was saw us the maintenance sheet in blank, we didn’t receipt maintenance sheet report were fill in.

 

3.              Spare part maintenance

We didn’t see Spare part maintenance report are carried out periodically with regular interval such as : Oil / fuel filter, carbon brush,  etc. excepted the chillier section

 

4.              Over haul

We didn’t see Over haul  report or schedule list.

 

 

FERILS OTHER THAN FIRE

Explosion          : Low- not exposed.

Lightning         :  Medium- the area is widely opened and the lightning conductor has  been  installed   at beam, it is not clear about grounding resistance. And it is not installed arrester

Flood               :  Medium- the equipment  is ground and many wall were leakage due to water ground.

RSMD              :  Medium- the risk is at the expose area

Burglary           : Low- there are 24 hours guard system by the security.

Impact              : low – not available transport are load / unload truck.

Storm               : Low

 

 

 

LOSS RECORD

 

Nil (not clear information).

 

 

PML

In the even of damage happened, it could damages the part of the insured content.

The PML is equal to 40 % of TSI.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOMMENDATIONS  :

 

1.              The insured must have a principles are successful operation and good maintenance is closely tied together. The primary purpose of good maintenance is to obtain safe, reliable, and economical operation. Competent operation requires close attention and good judgement of engine performance to recognise what maintenance to be done. And The maintenance must be planned to coincide with reduced production schedule. A well-organised plan and efficient mechanics are essential because time is often limit  It is important to keep accurate records to repairs made, parts used, and notes indicating parts that will require attention at next shutdown.  An inventory record of repair parts is useful in assuring that parts are available when needed. (It is must be make maintenance schedule / report list each section )

2.              A maintenance service should be provided for periodical round at the equipment as specially in the generator area (It must be make checklist).

3.              Utmost attention should be paid to good house keeping such as periodical removal of dust / waste / unused goods / packing material scattered / oil leaking on floor of utilities area either by burning on site at a safe location or removal from site and clean-up of side at least once a day.

4.              It is recommended to installed  air condition / air fan in the transformer room area and Control panel room near transformer area  immediately due to very hot.

5.              We noted that the Transformer power no 2 has temperature 75° C due to over load power. It is recommended to decrease the power and checked the transformer condition.

6.              Bound wall should be provided below the diesel fuel tank near generator room area.

7.              We recommend to every circumstance that needs covering to the MCB (on the panel box), the cover should not be combustible one. The electrical panel must be enclosed to avoid dust accumulated on it. It is recommended to Clean the electric panel due to dust accumulated and the electrical panel must checked regularly due to prevent short circuit and over current / voltage.

8.              The electrical cables must far from lightning conductor and to ensure that the incoming / out going communication line, electrical line, machinery, flammable tank and lightning conductor must be have grounding resistance below 0.5 ohm. And it must be installed Arrester  as specially at the incoming telephone line  due to protect electric static, Over current / over voltage and lightning.

It is recommended to install the unbalance phase / phase failure breaker and winding thermal  breaker for  motor panel to avoid electrical overload.