PROPERTY SURVEY REPORT
GENERAL INFORMATION
- Policy Number :
- Name of insured :
- Coverage : Property All Risk
- Request by : Mr.
Yandy
- Source of business : Ms.
Nendah (TDP)
- Period :
- Sum insured : IDR. ,-
- Person
interviewed : Mr.
Sukardi.
- Date of survey : 6
April 2009
- Name of surveyor : Ir.
Sudarno
- Location of Risk :
- Type of Risk : Gas
Industry
BRIEF
DESCRIPTION
The insured is
a local company. The risk insured is Gas Industry factory for local market (100%) as specially for Oxygen, Argon, Carbon
dioxide, Nitrogen, The mayor of product is mass product
The
premises was managed by own Management
with minimum fire fighting standard. They have portable fire extinguisher
facilities
The insured
premise is located in Pulo Gadung Industrial area, The insured premise is
approx. 2500 m from Pulo Gadung bus station area, which is ten minutes to
drive. The insured is easily accessible from all areas with Pulo Kambing road
nearby. It occupies approx. 24,000 sq. m. of land area, with approx. 19,000 sq.
m of
building area, as follows :
1.
Production building (utilities,
etc.
2.
Filling building .
3.
office building
4.
Workshop building
Comments :
The lay-out of plants generally in different roof (production,
filling, office, workshop building have distance approx. 6 meters distance with
the high buildings more than 8 meters and any building in one roof such as ring
spinning, waving and warehouse building..
Building inside the premise are closely arranged, some are adjacent
one to the other, How ever, the whole premises is accessible by fire truck for
fire fighting purpose. Drive ways inside the premises are 5 to 6 m wide, with
asphalt and con concrete pavement.
The insured premise is
built on the site–land that is approx. 50 cm higher than the internal road or
surrounding and every front entrance located gutter as drainage, it is
considered not effecting the premise with regard to the flood exposure. At the
time of our survey, we did not see any abnormal condition in vicinity at the
surrounding that would expose to the premise.
The insured stopped production since December 2008 and bought gas from another company for supply
customer
Tirta bumi adyatunggal was taken
over form PAN GAS NUSANTARA Since 2000
OVERALL
RATINGS excellent
good medium fair bad
- Management o o þ o o
- Protection o o o þ à þ
- Housekeeping o o o þ o
- Occupancy
hazard o o o þ o
- Exposure o o o þ o
- Classification
of risk o o o þ o
BUILDINGS
1.
The
production building construction is
class I with construction of roof is steel, roof covering is steel, wall is
brick, pillar is steel, floor is concrete, doors are wood, and steel, storeys
are steel.
2.
The
filling building construction is class I
with construction of roof is steel, roof covering is steel, wall is brick,
pillar is steel, floor is concrete
3.
The
workshop building construction is class
I with construction of roof is steel, roof covering is steel, wall is brick,
pillar is steel, floor is concrete, doors are wood, and steel, storeys are
steel.
4.
The
office building construction is class I
with construction of roof is steel, roof covering is steel, wall is brick,
pillar is steel, floor is concrete, doors are wood, and steel, storeys are
steel.
Comments:
- Overall rating for construction can
be considered to be fair.
1. Lightning conductor þ available o not available (certificate not available)
Type : Conventional, radius =
-, Conductor : BC – 50 sq. mm, Resistance : 2 – 3 (ohm)
2. Layout out plan þ available o not
available
3. Fire Division :
not available
4. Age of building : 1991
5. Conditions / maintenance o good þ fair o bad
6. Value according surveyor o O.K. o under
insured o bad
LOCATION / ADJACENCY
Location : o densely populated area with high conflagration
o suburb
o real estate
þ industrial site
o housing area
o business street
þ
shopping area
- front Industrial road …… .........
Comments :
Protected by: The site has been fenced in completely by metal
lattice fenced with height 2 metres. All gates are closed or manned at all
times
.
The site is accessible
via a paved road through a main gate. The Internal roads are paved and well
laid out. All parts of the plant are easily accessible. There area one access way to the plant, through the main
gate is guarded by security guards.
CONTENTS
(Form & type of packing + values
according to surveyor + amount of flammable chemicals)
- Extra
– hazardous goods : -
- Hazardous
goods : -
- Non
hazardous goods : -.
- Machinery's
/ equipment : -.
- Household
goods / office equipment : furniture, AC, Computer.
PROCESS
The process is
made on the machine with certain ways depend on the product.
PPMF :
Polypropylene Multi Filament
Raw material à Mixing à extruder à Stretching à winder à test QC à UP twister à Packaging
PP resin 100° C - 230°C tension strength
Ultra violet
stabiliser colour
Colour Master
batch Elongation
SPW oil Tenasity
FIBC : Flexible Intermediate
Bulk Container
Raw material à Cutting à sewing à Packaging
PP sheet
Comments :
Process hazard (location and name of hazard)
Short circuit risk in the electric panel
room (speciality at pump room)
In workshop and utility room, there are also
possibilities of short circuit risk.
There are possibilities of explosion risk in
silos, oil tank and compressors.
Lightning risk due to the plant is in the
open area and it is not arrester installed
Short circuit risk exists in production
process, which are interconnected automatically one another
The dust collection system.
Hot working at production area
STOCK:
Raw material : PP resin : 60 tons
The raw materials are stored in 15 units of silos,
which have excellent construction and lay out.
Comments: Its hazard rating can be considered normal
Stock types are accessories of car
i.e.: rearview mirror, lamp, steering wheel padlock, muffler etc. No adequate information regarding stocks
quantity due to insured had no booking system for monitoring stocks inventory
in site.
Finishing goods stock : PPMF : 85 tons
Finished goods are stored in warehouse building, which
are adjoining to production building and utility building. Some of the finished goods are piled in high
pilling.
Stock types are accessories of car
i.e.: rearview mirror, lamp, steering wheel padlock, muffler etc. No adequate information regarding stocks
quantity due to insured had no booking system for monitoring stocks inventory
in site.
Comments: It can be considered to be enhanced hazard
The production
capacity : PPMF : 60 - 70 tons per month as job order (60% - 70 % of
full capacity)
FIBC
: 32,000 piece per month
HOUSE KEEPING :
1. Cleanliness : considered fair
We
watch the warehouse heavily occupied, in stairway stocks also stacked. Many of
unused plastic and carton box found everywhere.
2. Smoking prohibition : available
In
building, smoking area available in front side of 1st floor only.
Unfortunately no adequate “No Smoking” signs installed by insured.
3. Production arrangement : considered fair
4. Storage arrangement
- free
gangway / aisle : adequate
- staple
height : 2 m
5. a. Storage condition : o light þ moderately o heavily or
o congested occupied
b. Stock card : þ available o not available
comments :
- The
finished products are stored temporarily in the end of each production line.
There was no abnormal placement in vicinity.
- They are placed were noted on floor. The arrangement was considered not in order
but we were advised that it was because of that time, they were on
re-arrangement in order to get tidy and neat placement.
- Fuel
Oil is stored in bulk and the diesel fuel tank are fair separated from the
nearest production building and warehouse and they are not bounded
There is telephone number list
available surrounding telephone in 1st floor for emergency call
i.e.: police station telephone number, public fire brigade telephone number,
etc.
6. Height of ceiling
- roof : 3 & 8 meters
- ventilation
openings : 0.5 meter
7 Waste
disposal : Not advised
8. External
housekeeping : consider fair
9. Electricity
available inside godown : þ available o not available
condition : o good þ fair o bad
FIRE PROTECTION
- Public
fire brigade - nearest location : Lippo
Cikarang
- distance : 300 m
- time required to arrive at site : 5
minutes
- periodical risk inspection : þ yes o no
- accessibility to enter risk : þ easy o no
- water for fire fighting available : þ yes þ no tank
: 5 m3
- alarm to fire dept. : telephone ………………….
Comments:
-
There are some Fire Brigades available owned by
-
The insured has also dedicated fire safety
team within the organization. They
have regularly training for safety skill and sometime send some employees to
pertamina for training.
-
All officers are expected capable to use the hand held extinguisher,
fire fighting procedure including evacuation procedure.
-
Each shift is reported has
fire team who has conducted fire drill and training regularly. The team is
expected as the frontiest persons to anticipate fire before the fire brigade.
Addition equipment for fire
fighting
1. Portable Fire Pump :
N.a.
2. Breathing apparatus :
N.a.
3. fire protection dress :
N.a.
- Portable
fire extinguishers : available.
þ Type Co2 o foam þ dry powder o BCF / Halon o others
amount
of extinguishers o enough þ insufficient
how many :
comments :
Portable fire extinguishers
were provided in all common areas (corridor) throughout the building. They were
conspicuously mounted on the walls or building columns for immediate use to
suppress any incipient fire, prior to the activation of sprinkler. Some of portable extinguisher were collected near
doors / gate.
There is various size of portable fire extinguishers
(hand held type and wheeled type) that mostly filled with Dry chemical and CO2.
In the raw material / finishing goods warehouse, and production area was not
installed adequate portable fire extinguishers (total number of portable
extinguishers were not in conformity with area Total numbers of portable fire
extinguishers are not clear.).
Fire extinguisher placed in
strategic places surrounding the building. In every access of
stairway, there is plan layout with pictures of fire extinguisher placed. It
also explain emergency path for emergency case.
- Others - hydrant system : o yes þ no
- fire detection system/smoke/heat : o yes þ no
comments :
The Insured has installed
alarm every floors. Smoke detector and heat detector (NATIONAL) every 5 sq. m.
with temperature 135° F (57° C). There are using conventional fire alarm systems for public
area, corridor, and addressable for room units.
Push –button alarm is also
available, It was installed in every
building near entrance doors, Both automatically and manual alarm system are
addressable.
We tested to the work
of alarm and it was provide good result.
- Remarks :
Water is supplied by seven deep wells each with
capacity of 350 l/min (100m deep), Pumped by 10 Hp pump. There also a connected
to the town main system for drinking water, which is kept in reinforced
concrete water tower tank 500 cu. m. capacity
All fire pumps are installed in the ground floor
taking suction from a 1,000 cu. m, 308 cu. m. and 250 cu. m hydrant water
storage tank in pump station which is automatically replenished by deep well
pumps.
Hydrant system is
reportedly fed by pump station is located in the rear of building area for consumption of all
building.
We
checked that there are 3 location of the
pump station with the same characterises
and it was interconnected, the specification as follows :
1
unit electric motor driven EBARA fire
pumps rated 126 cu per hours, 60 HP,
head: 85m, 2960 Rpm, year … with system auto power 3 s/d 9.5 bar.
2
unit electric motor driven EBARA fire
pumps rated 68 cu per hours, 40 HP,
head: 85m, 2960 Rpm, year … with system auto power 4 s/d 9.5 bar.
1
unit HATZ Diesel driven EBARA fire pumps rated 126 cu per
hours, 60 HP, head: 85m, 2960 Rpm, year
… with system manual power.
2
unit HATZ diesel driven EBARA fire
pumps rated 68 cu per hours, 40 HP,
head: 85m, 2960 Rpm, year … with system auto power.
1
unit of Jockey pumps are also installed in each fire pump system to pressurise
the sprinkler systems and hydrant system with electric motor driven serro fire
pump 4 cu. m per minutes, 2.2 KWATT, Head: 175 m, 2900 Rpm, with system auto
power 6 s/d 7 bar off.
The insured have swimming pool with capacity is 500 m3, which it is
not connected with fire water.
Comment s :
The whole area is covered by hydrant system. Main
Hydrant pipe is 8” in diameter which branches of 6” diameter, every hydrant
outlet is equipped with nozzle and a 20 m or 30 m hose.
2 unit of Siamese connection (breaching inlets) with 2.5 inch pipe
for the fire pumps are installed outside the building for easy access by fire
brigade during an emergency.
We carried out a test during our inspection, and noted
that operation were competent. Water pressure appeared to adequate (Hydrant test result : OK it was visually satisfactory))
Water from PDAM is flown by pump into water tank. It can be
considered to be adequate for the entire premises
EXTRA PERILS
- Flood / water damage : Low, the risk is far from drainage
(no history)
-
RSMD / vandalism : Low, the risk is near industrial
area.
Comments :
We consider that potential problems from the said labours
are low because they have good relationship both between labour to labour and
labour to management. The management
also takes care of labour’s welfare
- Earthquake : light, zone II
- Burglary / theft :
Low, insured is enclosed with
fence
- Explosion : low, there are less possibility of this risk
- Lightning : minor,
the building is equipped with lightning arrested
- Impact : low,
vehicle impact would be damaging stock stored outside.
- Storm : minor
CLAIMS EXPERIENCE
(amount, cause of fire, date of fire) : nil
INSTALLATIONS
1. Electrical - power supply o good þ fair o bad
- wiring o good þ fair o bad
- lighting / fixtures o good þ fair o bad
Comments:
-
The electric supplied from PLN use for lightning, packing, and in
emergency situation.
-
The generators set use for all operations in the plant, mainly for
production process. Three of six generators set available use for full
operation, and the rest are always standby as a reserve for in the case of the
plant needs more capacity.
- The electrical wiring was considered to be
in generally acceptable condition throughout the production areas with most of
the power cables being in PVC conduit. Power distribution cables in production
areas were noted as being in generally fair condition.
2. Powerhouse : .11 KVA (PLN) distance from any
building meters
Emergency generators / where / for which
purpose : 1 unit Cartepilar diesel driven Cartepilar AC generator, 500 KVA.
Transformer UNINDO 1600 KVA, 1993.
Inspections
: yes; type of inspections: regular maintenance checked by own staff
The insured has PLN connection with a continuous rating Input of
9,500 KVA which is used for air
conditioning, weaving and garment plant and the power was expanded 6000 KVA for dyeing and other plant.
14 unit diesel Deutz driven 9 unit AVK generator each of 1000
KVA and 3 unit reliance generator each
of 1000 KVA and 2 unit Deutz diesil
engine each of 1,585 KVA In normal condition 10 generators are operating, 2
units is service and 2 units as back up
The PLN power about 50% for factory normal consumption, the rest 50%
is obtained from own generator set.vc
The Voltage step down from 20 KV to 380 KV via 12 units oil cooled
transformer, rated 1000 KVA and 5 units
2500 KVA
PLN à TRAFO à MDP à
Capacitor bank à
MCB 1
20 KV – 380 V à MCB 2
Diesel à MCB N
3.
Air – condition - split, considered fair
4. Exhaust - type & number not available
- wiring condition
5. Boiler
(certificate & maintenance contract)
: not available condition :
-
There are one steam production
natural gas fire boiler in the mechanical pad section. The boilers are
“STANDARD KESSEL” with volume 8000 kg/hours, pressure = 10 kg/cm2, 1993. With
good water purification and all of the proper safety controls are provided,
otherwise the insured boiler operators have certificates.
6. - Paint spraying / spray both. : not
available
- Housekeeping inside spray room. -
7.
Welding : considered fair
Welding is rarely carried out and formal welding permit procedure is
in place. The permit form was not observed but fire watch is provided during
welding operation.
Compressor :
In our resurvey visit to the risk location, we see
some compressors which are all in fair condition. There is many unit compressor that is used in production process with
many brand.
such 2 unit of Atlas Coppo
500 HP, with 10 kg/cm2 pressure, and 2
units of Broom Wade compressor with 100 HP..
Chillier :
All Production process areas are air-conditioned and supplied from
air conditioning stations which are connected to chillier at utility Building.
PT1 is supplied by 2 x 780 TR of TRANE chillers (both Chillers are in operation) PT2 has 3 x 500 TR chillers (two chillers are in
operation, one is stand by)
There is 4 unit chillies, 1
unit 800 RT Trane, 2 units 400 RT Sulzer and 1 unit 600 RT sulzer
MAINTENANCE
Impression of maintenance
: fair
Comments:
Own staff of respective department either mechanical or
electrical in Maintain schedule is based on timely basis and condition basis.
All Maintenance activity is documented.
The Basic Schedule maintenance system is a preventive
maintenance, and the process are :
-
To
avoid break down of equipment
-
To
minimize repair cost and production cost.
BUSINESS INTERUPTION INFORMATION
Interdependencies
The plant has no
interdependence towards other flour mills.
Bottlenecks
From generator
sets view point; we thought that it is not a bottleneck situation to be
necessary anticipated. So far, there is
no problem in that case. The port is
only used for receiving raw material they need, and it is not a port for public
us. All of activities on the port are under the insured’s control. Therefore, no specific bottlenecks are
anticipated in respect of the environmental issues.
Buildings, Machineries
Buildings have a
replacement period of about 2 years in the big damage.
Machineries have
delivery and installation time of at least 6 months.
Stock of raw
material and supplies
Raw materials
are imported from
There is no
problem for supplies the said raw materials
Subcontracting
In case of a
loss of the primary machineries, they have good technician and good
relationship with other workshop.
BI exposure rating
- Shifts,
working hours, days : 2 shifts
(07.00 / 7 days
Major areas not occupied : during night the workers less than at
control & round trips / watch –
clock : 13
persons / 3 shifts, watch clock : No-
Comments:
- It can be
considered safe enough
- There
are about 30 peoples who specialised located in the premises area, security
guards who watch the premise for the whole days divided into 4 group for three
shifts. The Insured have one the guard post is to watch people go in and out
whole area It was installed sport light
every corner of plant and transceiver communication. The Insured have good
relation with local army.
- The
members carry out regular patrols using a clocking system. Security post are
distributed through the premise with distance one to another’s, there are 7
post unit
- M.P.L. / A.S. estimation : There is no value
breakdown available but we assumed that the main building is full machinery and including raw
material, finished goods building. The
PML could reach 90%.