PROPERTY SURVEY REPORT

GENERAL INFORMATION

-      Policy Number                          :            

-      Name of insured                        :            

-      Coverage                                   :             Property All Risk

-      Request by                                 :             Mr. Yandy

-      Source of business                    :             Ms. Nendah (TDP)

-      Period                                        :            

-      Sum insured                              :             IDR. ,-

                                                                       

-       Person interviewed                  :             Mr.  Sukardi.

                                                                       

-      Date of survey                           :             6  April 2009

-      Name of surveyor                     :             Ir. Sudarno

-      Location of Risk                       :            

 

-      Type of Risk                             :             Gas Industry

BRIEF DESCRIPTION

The insured is a local company. The risk insured is Gas Industry factory for local market  (100%) as specially for Oxygen, Argon, Carbon dioxide, Nitrogen, The mayor of product is mass product

 

The premises  was managed by own Management with minimum fire fighting standard. They have portable fire extinguisher facilities

 

The insured premise is located in Pulo Gadung Industrial area, The insured premise is approx. 2500 m from Pulo Gadung bus station area, which is ten minutes to drive. The insured is easily accessible from all areas with Pulo Kambing road nearby. It occupies approx. 24,000 sq. m. of land area, with approx. 19,000 sq. m  of  building area, as follows :

1.               Production building (utilities, etc.

2.               Filling building .

3.                office building

4.               Workshop building

 

Comments :

 

The lay-out of plants generally in different roof (production, filling, office, workshop building have distance approx. 6 meters distance with the high buildings more than 8 meters and any building in one roof such as ring spinning, waving and warehouse building..

 

 

Building inside the premise are closely arranged, some are adjacent one to the other, How ever, the whole premises is accessible by fire truck for fire fighting purpose. Drive ways inside the premises are 5 to 6 m wide, with asphalt and con concrete pavement.

 

The insured premise is built on the site–land that is approx. 50 cm higher than the internal road or surrounding and every front entrance located gutter as drainage, it is considered not effecting the premise with regard to the flood exposure. At the time of our survey, we did not see any abnormal condition in vicinity at the surrounding that would expose to the premise.

 

The insured stopped production since  December 2008  and bought gas from another company for supply customer

Tirta bumi adyatunggal was taken over form PAN GAS NUSANTARA Since 2000

 

OVERALL RATINGS                 excellent            good               medium                fair                                             bad

-      Management                               o                           o                             þ                                                                  o                           o

-      Protection                                   o                           o                             o                                                     þ à                 þ

-      Housekeeping                             o                            o                             o                                                                  þ                      o

-      Occupancy hazard                      o                           o                       o                                                                  þ                      o

-      Exposure                                     o                           o                              o                                                                  þ                      o

-      Classification of risk                   o                           o                             o                                                     þ                      o

 

BUILDINGS

1.               The production building  construction is class I with construction of roof is steel, roof covering is steel, wall is brick, pillar is steel, floor is concrete, doors are wood, and steel, storeys are steel.

 

2.               The filling building  construction is class I with construction of roof is steel, roof covering is steel, wall is brick, pillar is steel, floor is concrete

 

3.               The workshop building  construction is class I with construction of roof is steel, roof covering is steel, wall is brick, pillar is steel, floor is concrete, doors are wood, and steel, storeys are steel.

 

4.               The office building  construction is class I with construction of roof is steel, roof covering is steel, wall is brick, pillar is steel, floor is concrete, doors are wood, and steel, storeys are steel.

 

Comments:

-             Overall rating for construction can be considered to be fair.

 

1.      Lightning conductor                   þ available        o not available (certificate not available)

Type : Conventional, radius = -,  Conductor :  BC – 50 sq. mm, Resistance : 2 – 3 (ohm)                                      

2.      Layout out plan                           þ available        o not available

 

3.      Fire Division                               : not available

4.      Age of building                           : 1991

5.      Conditions / maintenance           o good                þ fair                                                                                               o bad

6.      Value according surveyor           o O.K.                o under insured                                                           o bad

LOCATION / ADJACENCY

Location              :             o  densely populated area with high conflagration

                                           o  suburb

o real estate

þ industrial site

o housing area

o business street

                                           þ  shopping area

 

Adjacent risks                                    Class of construction                                                                    Distance

-       Right           Vacant                     .................                                            ...........

                  

-      Left    Aqua warehouse                  1st (first) class                                        10 meters from the building.

-      front   Industrial road                     ……                                                          .........

-      back   Sari Ayu plant          1st (first) class                                               10 meters from the building.

Rating of exposure     :                      þ light                  o medium                      o severe

Comments :

 

Protected by: The site has been fenced in completely by metal lattice fenced with height 2 metres. All gates are closed or manned at all times

.

The site is accessible via a paved road through a main gate. The Internal roads are paved and well laid out. All parts of the plant are easily accessible. There area one  access way to the plant, through the main gate is guarded by security guards.

 

CONTENTS

(Form & type of packing + values according to surveyor + amount of flammable chemicals)

-      Extra – hazardous goods                         :                      -

-      Hazardous goods                                     :                      -

-      Non hazardous goods                              :                      -.

-      Machinery's / equipment                         :                      -.

-      Household goods / office equipment      :                      furniture, AC, Computer.

 

PROCESS

The process is made on the machine with certain ways depend on the product.

 

PPMF : Polypropylene Multi Filament

 

Raw material     à Mixing  à extruder à Stretching à winder à test QC à UP twister à  Packaging

PP resin                                  100° C - 230°C                                      tension strength

Ultra violet stabiliser                                                                           colour

Colour Master batch                                                                             Elongation

SPW oil                                                                                                Tenasity

 

 

FIBC : Flexible Intermediate Bulk Container

 

Raw material         à Cutting à sewing à Packaging

PP sheet

                                                           

Comments :

 

Process hazard (location and name of hazard)

 

Short circuit risk in the electric panel room (speciality at pump room)

In workshop and utility room, there are also possibilities of short circuit risk.

There are possibilities of explosion risk in silos, oil tank and compressors.

Lightning risk due to the plant is in the open area and it is not arrester installed

Short circuit risk exists in production process, which are interconnected automatically one another

The dust collection system.

Hot working at production area

 

STOCK:

Raw material                      :  PP resin : 60 tons

The raw materials are stored in 15 units of silos, which have excellent construction and lay out.

 

Comments: Its hazard rating can be considered normal

Stock types are accessories of car i.e.: rearview mirror, lamp, steering wheel padlock, muffler etc. No adequate information regarding stocks quantity due to insured had no booking system for monitoring stocks inventory in site.

 

 

Finishing goods stock        :   PPMF : 85 tons

Finished goods are stored in warehouse building, which are adjoining to production building and utility building.  Some of the finished goods are piled in high pilling.

Stock types are accessories of car i.e.: rearview mirror, lamp, steering wheel padlock, muffler etc. No adequate information regarding stocks quantity due to insured had no booking system for monitoring stocks inventory in site.

 

Comments: It can be considered to be enhanced hazard

 

 

The production capacity    :  PPMF : 60 - 70  tons per month as job order (60% - 70 % of full capacity)

                                                          FIBC : 32,000 piece per month

 

HOUSE KEEPING     :

1.      Cleanliness                                          :  considered fair

       We watch the warehouse heavily occupied, in stairway stocks also stacked. Many of unused plastic and carton box found everywhere.

 

2.      Smoking prohibition                            :  available

       In building, smoking area available in front side of 1st floor only. Unfortunately no adequate “No Smoking” signs installed by insured.

 

3.      Production arrangement                      :   considered fair

4.      Storage arrangement

-      free gangway / aisle                      :  adequate

-      staple height                                 :  2 m

5.    a.    Storage condition                         :  o light                 þ moderately      o heavily  or

                                                                        o congested occupied

 

       b.    Stock card                                     :  þ available         o not available

comments :

-        The finished products are stored temporarily in the end of each production line. There was no abnormal placement in vicinity.

-          They are placed were noted on floor.  The arrangement was considered not in order but we were advised that it was because of that time, they were on re-arrangement in order to get tidy and neat placement.

-          Fuel Oil is stored in bulk and the diesel fuel tank are fair separated from the nearest production building and warehouse and they are not bounded

There is telephone number list available surrounding telephone in 1st floor for emergency call i.e.: police station telephone number, public fire brigade telephone number, etc.

 

6.      Height of ceiling

-      roof                                               :  3 & 8 meters

-      ventilation openings                     :  0.5 meter

7     Waste disposal                                     :  Not advised

8.    External housekeeping                        :  consider fair

9.    Electricity available inside godown     :  þ available         o not available

                                                   condition  :  o good                    þ fair                       o bad

FIRE PROTECTION

-      Public fire brigade                    -    nearest location                              :       Lippo Cikarang

                                                          -    distance                                          :          300 m

                                                          -    time required to arrive at site         :          5 minutes

                                                          -    periodical risk inspection               :      þ yes                o no

                                                          -    accessibility to enter risk                :      þ easy                                                      o no

                                                          -    water for fire fighting available     :      þ yes                                                        þ no  tank : 5 m3

                                                          -    alarm to fire dept.                           :                                                  telephone  ………………….

Comments:

-                 There are some Fire Brigades available owned by Tanjung Intan Port, by Pertamina, and by government.

-                The insured has also dedicated fire safety team within the organization.    They have regularly training for safety skill and sometime send some employees to pertamina for training.

-                 All officers are expected capable to use the hand held extinguisher, fire fighting procedure including evacuation procedure.

-                  Each shift is reported has fire team who has conducted fire drill and training regularly. The team is expected as the frontiest persons to anticipate fire before the fire brigade.

 

Addition equipment for fire fighting

1.    Portable Fire Pump           : N.a.

2.    Breathing apparatus          : N.a.

3.    fire protection dress           : N.a.

 

-      Portable fire extinguishers        :    available.

       þ Type Co2               o foam                þ dry powder            o BCF / Halon    o others

       amount of extinguishers                      o enough                þ insufficient

        how many  : 

 

comments :

 

Portable fire extinguishers were provided in all common areas (corridor) throughout the building. They were conspicuously mounted on the walls or building columns for immediate use to suppress any incipient fire, prior to the activation of sprinkler. Some of  portable extinguisher were collected near doors / gate.

 

There is various size of portable fire extinguishers (hand held type and wheeled type) that mostly filled with Dry chemical and CO2. In the raw material / finishing goods warehouse, and production area was not installed adequate portable fire extinguishers (total number of portable extinguishers were not in conformity with area Total numbers of portable fire extinguishers are not clear.).

 

Fire extinguisher placed in strategic places surrounding the building. In every access of stairway, there is plan layout with pictures of fire extinguisher placed. It also explain emergency path for emergency case.

                                                                       

-      Others                                                  -    hydrant system  :    o yes                 þ     no

                                                                    -    fire detection system/smoke/heat : o yes þ no

 

comments :

The Insured has installed alarm every floors. Smoke detector and heat detector (NATIONAL) every 5 sq. m. with temperature 135° F (57° C). There are using conventional fire alarm systems for public area, corridor, and addressable for room units. 

 

Push –button alarm is also available, It  was installed in every building near entrance doors, Both automatically and manual alarm system are addressable.

 

         We tested to the work of alarm and it was provide good result.

 

-       Remarks      :

 

Water is supplied by seven deep wells each with capacity of 350 l/min (100m deep), Pumped by 10 Hp pump. There also a connected to the town main system for drinking water, which is kept in reinforced concrete water tower tank 500 cu. m. capacity

 

All fire pumps are installed in the ground floor taking suction from a 1,000 cu. m, 308 cu. m. and 250 cu. m hydrant water storage tank in pump station which is automatically replenished by deep well pumps.

 

Hydrant system is reportedly fed by pump station is located in the rear of  building area for consumption of all building.

 

We checked that there are 3 location of  the pump station  with the same characterises and it was interconnected, the specification as follows :

 

1 unit  electric motor driven EBARA fire pumps rated 126 cu per hours, 60 HP,  head: 85m, 2960 Rpm, year … with system auto power 3 s/d 9.5 bar.

 

 

2 unit   electric motor driven EBARA fire pumps rated 68 cu per hours, 40 HP,  head: 85m, 2960 Rpm, year … with system auto power 4 s/d 9.5 bar.

1 unit  HATZ Diesel  driven EBARA fire pumps rated 126 cu per hours, 60 HP,  head: 85m, 2960 Rpm, year … with system manual power.

2 unit   HATZ diesel driven EBARA fire pumps rated 68 cu per hours, 40 HP,  head: 85m, 2960 Rpm, year … with system auto power.

1 unit of Jockey pumps are also installed in each fire pump system to pressurise the sprinkler systems and hydrant system with electric motor driven serro fire pump 4 cu. m per minutes, 2.2 KWATT, Head: 175 m, 2900 Rpm, with system auto power 6 s/d 7 bar off.

 

The insured have swimming pool with capacity is 500 m3, which it is not connected with fire water.

 

 

Comment s :

 

The whole area is covered by hydrant system. Main Hydrant pipe is 8” in diameter which branches of 6” diameter, every hydrant outlet is equipped with nozzle and a 20 m or 30 m hose.

 

2 unit of Siamese connection (breaching inlets) with 2.5 inch pipe for the fire pumps are installed outside the building for easy access by fire brigade during an emergency.

 

 

We carried out a test during our inspection, and noted that operation were competent. Water pressure appeared  to adequate (Hydrant test result : OK it was visually satisfactory))

 

Water from PDAM  is flown by pump into water tank. It can be considered to be adequate for the entire premises

 

EXTRA PERILS

-      Flood / water damage               :          Low, the risk is far from drainage (no history)

-      RSMD / vandalism                   :          Low, the risk is near industrial area.                                             

 

Comments :

We consider that potential problems from the said labours are low because they have good relationship both between labour to labour and labour to management.  The management also takes care of labour’s welfare

                            

-      Earthquake                                :          light, zone II

-      Burglary / theft                         :          Low, insured is enclosed with fence

-      Explosion                                  :          low, there are less possibility of this risk

-      Lightning                                   :          minor, the building is equipped with lightning arrested

-      Impact                                        :          low, vehicle impact would be damaging stock stored outside.

-      Storm                                        :          minor                      

 

CLAIMS EXPERIENCE

(amount, cause of fire, date of fire) :             nil 

 

 

INSTALLATIONS

1.    Electrical                                   -    power supply                o good                þ fair                                 o bad

                                                          -    wiring                           o good                þ fair                                 o bad

                                                          -    lighting / fixtures          o good                þ fair                                 o bad

Comments:

-        The electric supplied from PLN use for lightning, packing, and in emergency situation.

-        The generators set use for all operations in the plant, mainly for production process. Three of six generators set available use for full operation, and the rest are always standby as a reserve for in the case of the plant needs more capacity.

-      The electrical wiring was considered to be in generally acceptable condition throughout the production areas with most of the power cables being in PVC conduit. Power distribution cables in production areas were noted as being in generally fair condition.

 

 

2.    Powerhouse                               :    .11 KVA (PLN) distance from any building    meters

       Emergency generators / where / for which purpose : 1 unit Cartepilar diesel driven Cartepilar AC generator, 500 KVA. Transformer UNINDO 1600 KVA, 1993.

Inspections : yes; type of inspections: regular maintenance checked by own staff

 

The insured has PLN connection with a continuous rating Input of 9,500 KVA  which is used for air conditioning, weaving and garment plant and the power was expanded  6000 KVA for dyeing and other plant.

14 unit diesel Deutz driven 9 unit AVK generator each of 1000 KVA  and 3 unit reliance generator each of 1000 KVA  and 2 unit Deutz diesil engine each of 1,585 KVA In normal condition 10 generators are operating, 2 units is service and 2 units as back up

The PLN power about 50% for factory normal consumption, the rest 50% is obtained from own generator set.vc  

 

The Voltage step down from 20 KV to 380 KV via 12 units oil cooled transformer, rated 1000 KVA and 5 units  2500 KVA

 

PLN  à    TRAFO       à MDP à     Capacitor bank       à  MCB 1

                      20 KV – 380 V        ­                                            à  MCB 2

                                                  Diesel                                        à  MCB N         

 

                                          

3.    Air – condition                          -    split, considered fair

4.    Exhaust                                     -    type & number             not available

-     wiring condition

5.    Boiler (certificate & maintenance contract)  :  not available    condition          : -

There are one steam production natural gas fire boiler in the mechanical pad section. The boilers are “STANDARD KESSEL” with volume 8000 kg/hours, pressure = 10 kg/cm2, 1993. With good water purification and all of the proper safety controls are provided, otherwise the insured boiler operators have certificates.

 

6.    -  Paint spraying / spray both.   :    not available

       -  Housekeeping inside spray room.         -

       -  Explosion proof fixture/fitting :         o available             þ not available

7.     Welding                                    :     considered fair

Welding is rarely carried out and formal welding permit procedure is in place. The permit form was not observed but fire watch is provided during welding operation.

             

8.    Repair facilities                        :    considered fair

9.    Other heat sources                    :    considered fair

10.    Fuel tanks                                  :    SOLAR : 32,000 liters , 2 units, considered fair

         (capacity, location, piping system)

Compressor :

In our resurvey visit to the risk location, we see some compressors which are all in fair condition. There is many unit compressor that is used in production process with many brand.

 

such  2 unit of Atlas Coppo 500 HP, with 10 kg/cm2 pressure,  and 2 units of Broom Wade compressor with 100 HP..

 

Chillier :

All Production process areas are air-conditioned and supplied from air conditioning stations which are connected to chillier at utility Building. PT1 is supplied by 2 x 780 TR of TRANE chillers (both Chillers  are in operation) PT2 has 3   x 500 TR chillers (two chillers are in operation, one is stand by)

 

There is 4 unit chillies,   1 unit 800 RT Trane, 2 units 400 RT Sulzer and 1 unit  600 RT sulzer 

 

 

MAINTENANCE

 

Impression of maintenance :  fair

 

Comments:

 

Own staff of respective department either mechanical or electrical in Maintain schedule is based on timely basis and condition basis. All Maintenance activity is documented.

The Basic Schedule maintenance system is a preventive maintenance, and the process are :

-        To avoid break down of equipment

-        To minimize repair cost and production cost.

 

 

BUSINESS INTERUPTION INFORMATION

 

Interdependencies

 

The plant has no interdependence towards other flour mills.

 

Bottlenecks

 

From generator sets view point; we thought that it is not a bottleneck situation to be necessary anticipated.  So far, there is no problem in that case.  The port is only used for receiving raw material they need, and it is not a port for public us. All of activities on the port are under the insured’s control.  Therefore, no specific bottlenecks are anticipated in respect of the environmental issues.

 

Buildings, Machineries

 

Buildings have a replacement period of about 2 years in the big damage.

Machineries have delivery and installation time of at least 6 months.

 

Stock of raw material and supplies

 

Raw materials are imported from Austalia, America, Canada and West Europe, so it depends to exchange value of the currency.

There is no problem for supplies the said raw materials

 

Subcontracting

 

In case of a loss of the primary machineries, they have good technician and good relationship with other workshop.

 

BI exposure rating Normal

 

PERSONNEL

-      Number of employees                                 :   400 persons

-      Shifts, working hours, days                        :  2 shifts  (07.00 / 7 days

Major areas not occupied                            :  during night the workers less than at noon.

-      Closing hours                                              :   -

-      Security guards, number & frequency of                      

control & round trips / watch – clock         :  13 persons / 3 shifts, watch clock : No-       

 

Comments:

 

-      It can be considered safe enough  

-      There are about 30 peoples who specialised located in the premises area, security guards who watch the premise for the whole days divided into 4 group for three shifts. The Insured have one the guard post is to watch people go in and out whole area  It was installed sport light every corner of plant and transceiver communication. The Insured have good relation with local army.

-      The members carry out regular patrols using a clocking system. Security post are distributed through the premise with distance one to another’s, there are 7 post unit

 

No internal security guard formed, security matter handled by complex security guard. No adequate information regarding number of guards every shift.  

 

-      Directors, staff members or owner or

       proprietor living inside or nearby complex :   -

 

                                                                                                     Signature surveyor                                                                                                     :

                                                                                                     Date                                                                                                     :

 

 

 

 

RECOMMENDATION (for office use)            :

1.              Adequate number and size of ‘NO SMOKING’ signs must be installed in the vicinity of hazardous area.

2.              Any fire must be reported immediately to the site engineer, the person responsible for supervising fire protection and, if necessary, the guard at the gate via the existing communication system (walkie-talkie, telephone). An adequate alarm system (hooters or sirens) should be provided and regularly tested. Important telephone numbers (site engineer, person responsible for supervising fire protection, guard at the gate, fire brigade, doctor) must be prominently displayed near each telephone.

3.              The site engineer should be continually reminded of his responsibility for fire protection on the site. Even if the daily supervision responsibility is delegated, ultimate responsibility should still remain with the site engineer.

4.              A Watchman service should be provided for the site at night and at weekends (periodical watchman’s rounds).

5.              Utmost attention should be paid to good house keeping such as periodical removal of dust / waste / unused goods on external building, workshop area either by burning on site at a safe location or removal from site.

6.              Fire extinguisher must be located every 200 m2 at least 1 units of 6 kg of dry chemical / CO2. Every fire extinguisher location should be :

-        Accessible and free from obstruction materials.

-        Conspicuously marked by clearly visible sign.

-        Should indicate the expiry date.

-        Checked, maintained at regular intervals and must be recorded.

-        Should be hanged and spread out throughout the premises.

7.              The incoming / out going communication line, electrical line, machinery and lightning conductor must be have grounding resistance below 0.5 ohm, and it is recommended to installed Arrester..

8.              Leaking water from air conditions  in the reception should be repaired immediately.

9.              Fire fighting team should be formed, trained regular, and should be have fire fighting procedure. They should coordinate with the competent public fire brigade. Any equipment needed must be made available. The fire prevention measures required and the access routes should be coordinated in detail in advance with the public fire brigade.

 

 

INDICATED PREMIUM RATES

 

-             M.P.L. / A.S. estimation    : There is no value breakdown available but we assumed that the main  building is full machinery and including raw material, finished goods building.  The PML could reach 90%. 

 